The Wire and Pole Elimination Plan
The mission of the Commission des services électriques de la Ville de Montréal (CSEVM) is to plan, construct, maintain and manage buried conduits for power lines and telecommunications cables on Montréal's territory.
The CSEVM is responsible for developing the Wire and Pole Elimination Plan, whose program is based on the following criteria:
- Fire hazards;
- Problems associated with the accessibility and importance of urban activities;
- The existence of average-density urban areas with concentrations of buildings over six storeys high;
- The presence of heritage, cultural or tourist sites.
The CSEVM is in favour of burying wires, since an underground power grid is safer and impervious to weather conditions. Its existing program covers the nine boroughs in the former Ville de Montréal and will soon be extended to the entire territory of Montréal. Under that program, the plan calls for the burial of 65.2 kilometres of existing overhead wires.
|
|
|