Master Plan Master Plan Master Plan
Master Plan
Download Master Plan
Download this section
Master Plan > Part 1 > Chapter 2 > 2.2 > Objectif 3 > Action 3.1 - 5/5
    • Notre-Dame East, from Papineau to Autoroute 25 via Souligny (project under study by the Ministère des Transports du Québec in association with the Ville de Montréal);
    • Notre-Dame East, from Dickson to the eastern end of the island;
    • Papineau;
    • Pie-IX;
    • Rodolphe-Forget;
    • Rosemont (project under study by the Société de transport de Montréal);
    • Saint-Charles;
    • Saint-Jean;
    • Saint-Michel (project under study by the Société de transport de Montréal);
    • Sherbrooke.

Potential interventions

Given the high densities of the residential and employment areas to be served, the presence of Detailed Planning Areas with strong development potential (Bourget/Forget, Angrignon, Mount Royal, Havre de Montréal, Lachine Canal, East Lachine, Central Business District) and the potential for recreational/tourism development, the City has identified potential new public transportation corridors able to be served by metro, light rail or modern tramways. These are:

  • From the future metro station at the corner of Galeries-d'Anjou and Bélanger to the future Bourget;
  • From the Angrignon metro station to the LaSalle commuter train station and then towards the Borough of Lachine;
  • From the Old Port to the Borough of Lachine, along the Lachine Canal;
  • From the Quartier des spectacles to the Old Port, Parc Jean-Drapeau and Mount Royal.

Further studies will help determine the appropriate route and transport mode in each case.

Previous page Next page