Master Plan Fermer

Planning guidelines

1 Develop vacant or underused lots, while giving preference to the construction of indoor parking lots.
2 Ensure the urban integration of the eventual public transportation corridor from the Angrignon metro station to the LaSalle commuter train station and towards the Borough of Lachine.
3 Improve automobile access to the area via the Angrignon overpass, keeping in mind the projected redevelopment of the Turcot site.
4 Improve the image of the area by favouring quality architecture, a better streetscape and well-designed parking areas.
5 Redesign the public spaces, especially along Newman and around Carrefour Angrignon, in order to encourage pedestrian and bicycle traffic.
6 Increase the accessibility and visibility of Parc Angrignon.
Map Angrignon