Design a prestigious City gateway by improving the quality
of its architecture and landscape as well as the configuration of roads.
2
Support redevelopment of the employment area bounded by
highways 20 and 520 and Orly, by taking advantage of the planned reconfiguration of
the Dorval traffic circle and particularly by redesigning certain blocks in order
to favour new business activities.
3
Develop underused sites, particularly parking lots, by
intensifying activities and erecting buildings of high architectural
quality, whose density will be in line with the area’s intended role.
4
Redesign the Dorval interchange and the traffic circle
to improve traffic flow and ease spatial orientation while minimizing
spillover onto local streets.
5
Create a rail shuttle linking the airport with Central
Station.
6
Control the impact of air cargo operations, especially
those involving trucking.
7
Protect and improve the architectural quality of the main
airport terminal building.