Master Plan Master Plan Master Plan
Master Plan
Download Master Plan
Download this section
Master Plan > Part 1 > Chapter 2 > 2.3 > Objectif 5 > Action 5.5 - 2/2

Implementation measures

  • Consolidate the built environment and retail activity along Sainte-Catherine in Faubourg Saint-Laurent.
  • Improve the design of the main connections between the Quartier des spectacles and adjacent areas.
  • Convert some vacant lots into new public spaces.
  • Facilitate proximity of cultural creation, production and exhibition facilities.
  • Continue and intensify the integration of works of art into the public realm, particularly when designing new public spaces and promote this practice on private property.
  • Heighten the visibility of cultural facilities (e.g. with special signage or distinctive public space design).
  • Develop and implement the Politique de développement culturel (Cultural Development Policy).
  • Exempt appropriate cultural facilities being built in the Centre from construction density regulations.
Previous page Next page